Project Journey

From First Call
To Solar Power On

Yaha aap step-by-step dekh sakte hain ki Radhey Associates ke saath solar project ka flow kaisa hota hai – kab site visit hota hai, kab proposal milta hai, kab installation start hota hai, aur kab meter lagta hai.

Goal simple hai: aapko har step pe clear idea ho ki next kya hone wala hai, kis cheez me kitna time lag sakta hai, aur kis stage par kaun sa document ya approval chahiye.

Quick Snapshot
  • Step 1: First call, bill + requirement discussion.
  • Step 2: Site visit & technical survey.
  • Step 3: Design, proposal & finalisation.
  • Step 4: Installation & testing.
  • Step 5: Meter, documentation & handover.
High-Level Flow

5 Clear Steps From Start to Finish

Chahe project chhota ho ya bada, structure similar rehta hai – bas complexity change hoti hai. Har step pe aapko update milta hai, bina chase kiye.

1
Initial Call & Bill Study

Aapka latest bill, load pattern aur future usage discuss karte hain – basic doubts clear kiye jaate hain, options outline kiye jaate hain.

2
Site Visit & Technical Survey

Roof size, direction, shade, structure, wiring route – sab ground pe check kiya jata hai, photos & measurements ke saath.

3
Design, Proposal & Finalisation

System size (kW), brand options, expected generation, costing & payback – sab ek clear proposal me summarise kiya jata hai.

4
Installation & Quality Checks

Structure, panel mounting, wiring, earthing, inverter setup – saare steps clean & safe execution ke saath complete hote hain.

5
Documentation, Meter & Handover

Subsidy / net-metering forms me guidance, DISCOM coordination aur final handover + system demo ke saath project close hota hai.

Detailed Timeline

What Happens When

Har project thoda unique hota hai, lekin general timeline roughly iss pattern ko follow karti hai. Ye aapko ek realistic expectation set karne me help karega.

Day 0–2
Initial Discussion & Basic Sizing

Aap WhatsApp / call / form se connect karte hain. Hum aapka latest electricity bill, basic load info & roof description maangte hain.

Is data ke basis par ek rough system size aur direction decide hoti hai – yahi se hum decide karte hain ki site visit kab aur kaise schedule karein.

Day 2–5
Site Visit & Survey

Team aapke site par visit karke roof ko physically check karti hai – slab / sheet, shadow points, wiring path, inverter location, earthing possibility etc.

Photos, measurements aur observations likhe jaate hain, taaki design team ke paas clear picture ho aur kuch bhi assume na karna pade.

Day 5–8
System Design & Proposal

Survey ke baad, system design freeze hota hai – kitne kW, kitne panels, kya tilt & orientation, kaunsa inverter model etc.

Saare points ko ek written proposal me summarise kiya jata hai jisme costing, expected generation, basic single-line diagram & approximate payback include hota hai.

Post Approval
Booking, Material & Scheduling

Aap proposal approve karte hain, booking amount clear hota hai, aur material planning start ho jati hai – panels, inverter, structure, wiring, protection devices.

Saath hi, installation dates aapke convenient slots ke hisaab se lock kiye jaate hain – especially agar commercial ya institute project hai.

Installation Phase
Structure, Panels & Wiring

On-site execution stepwise hota hai – pehle structure, phir panels, phir DC wiring, phir AC side & earthing. Har step ke baad quick checks kiye jaate hain.

Project size ke hisaab se installation 1–5 days ke beech me complete ho sakta hai.

Post-Install
Testing, Documentation & Handover

Inverter & system testing hoti hai, documentation organise hota hai, aur subsidy / net-metering ke liye forms & process me guidance di jati hai.

Finally, aapko system demo, basic do’s & don’ts, aur contact details ke saath formal handover kiya jata hai.

Roles & Responsibilities

What We Handle vs What You Handle

Clear roles ka matlab hai less confusion. Neeche simple breakdown hai – Radhey Associates kya manage karta hai aur client side se kya expectations hoti hain.

What Radhey Associates Handles
  • Site visit, technical survey & roof assessment.
  • System design, brand selection & proposal preparation.
  • Material planning, delivery & on-site execution.
  • Structure, panel mounting, wiring & earthing as per standards.
  • Basic documentation help for subsidy / net-metering.
  • System testing, handover & initial monitoring guidance.
What We Expect From You
  • Recent electricity bills & basic load information share karna.
  • Site access & roof par survey / installation ke time coordination.
  • Proposal finalisation ke time pe clear feedback & questions.
  • Payment schedule follow karna jaisa project ke start me decide hota hai.
  • Required documents (ID, address, DISCOM details etc.) ready rakhna.
  • Post-install basic cleaning & safety guidelines follow karna.
Documents & Approvals

Paperwork You Should Be Aware Of

Exact document list DISCOM, policy aur project type ke hisaab se change ho sakti hai, lekin broadly ye items usually required hote hain.

For Residential Rooftop
  • Recent electricity bills.
  • ID proof & address proof of owner.
  • Property ownership document / NOC if required.
  • Basic site photos (if remote pre-check needed).
For Commercial / Institutions
  • Electricity bills for last few months.
  • GST / company details (where applicable).
  • Authorised signatory details & ID proofs.
  • Load sanction details from DISCOM.
For Subsidy / Net-Metering
  • DISCOM-specific forms & online applications.
  • Bank details where required.
  • System commissioning photos & documents.
  • Any other item as per latest policy.
Process FAQs

Common Questions About Timeline

Start se end tak time, approvals, visits – in sab ke around kuch common sawaal hamesha aate hain. Unme se kuch ka short answer yaha diya hai.

Site visit tak kitna time lagta hai?
Usually initial call / enquiry ke 1–3 days ke andar site visit schedule ho sakta hai, depending on location & availability.
Proposal kab milta hai?
Site survey ke 2–3 working days ke andar detailed proposal ready hota hai – residential ke liye usually faster, commercial ke liye thoda detail me.
Installation khatam hone me kitna time lagta hai?
Small rooftop systems often 1–2 days me complete ho sakte hain. Large / complex roofs or commercial setups me 3–5 days bhi lag sakte hain.
Meter & subsidy process kitna time leta hai?
Ye DISCOM, policy aur workload par depend karta hai. Hum aapko realistic estimate aur regular updates dete rehte hain, but final timeline DISCOM ke control me hoti hai.
Agar mujhe urgent timeline chahiye to?
Aap agar starting me hi timeline urgency bata dein to hum planning stage par hi us hisaab se feasibility check kar lete hain aur jo possible hai clearly communicate kar dete hain.

Want to Walk Through This Flow for Your Site?

Bas apna latest electricity bill aur site ka basic idea humse share karein – hum aapke liye yehi process personalize karke explain kar denge.